RAIS Pilar User Manual Page 64

  • Download
  • Add to my manuals
  • Print
  • Page
    / 218
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 63
60
English RAIS/
attika
- U
ser manual for New PILAR / PILAR 13
Convection
RAIS/
attika
stoves are convection stoves. This means that the stove’s back and side
panels are not over-heated. Convection means that there is a circulation of air, which
ensures that the heat is distributed more evenly throughout the entire room. The cold air
is sucked in at the base of the stove up through the convection channel, which runs along
the stove’s combustion chamber. The heated air pours out at the top of the stove, which
ensures a circulation of warm air throughout the room.
Chimney
The chimney is the driving force which makes the stove function. In order for the stove to
perform satisfactorily the chimney height must be sufficient to ensure the correct draught
of 14 to 18 Pa so as to clear the products of combustion and prevent problems of smoke
emanating into the room when firing.
NOTE: A chimney height of not less than 4.5 metres measured vertically from the outlet
of the stove to the top of the chimney should be satisfactory. Alternatively the calcula-
tion procedure given in BS 5854:1980 may be used as the basis for deciding whether a
particular chimney design will provide sufficient draught.
The outlet from the chimney should be above the roof of the building in accordance with
the provisions of Building Regulations Approved Document J.
If installation is into an existing chimney then it must be sound and have no cracks or
other faults which might allow fumes into the house. Older properties, especially, may
have chimney faults or the cross section may be too large i.e. more than 230 mm x 230
mm. Remedial action should be taken, if required, seeking expert advice, if necessary. If it
is found necessary to line the chimney then a flue liner suitable for solid fuel must be used
in accordance with Building Regulations Approved Document J.
Any existing chimney must be clear of obstruction and have been swept clean immedi-
ately before installation of the stove. If the stove is fitted in place of an open fire then the
chimney should be swept one month after installation to clear any soot falls which may
have occurred due to the difference in combustion between the stove and the open fire.
If there is no existing chimney then either a prefabricated block chimney in accordance
with Building Regulations Approved Document J or a twin walled insulated stainless steel
flue to BS 1856-1 can be used. These chimneys must be fitted in accordance with the
manufacturer’s instructions and Building Regulations.
A single wall metal fluepipe is suitable for connecting the stove to the chimney but is not
suitable for using for the complete chimney. The chimney and connecting fluepipe must
have a minimum diameter of 125 mm. Any bend in the chimney or connecting fluepipe
should not exceed 45°. 90°bends should not be used.
Important Warning –Preparatory Work and Safety Checks:
• This stove must not be installed into a chimney that serves any other heating appli-
ance.
• It’s recommended not have an extractor fan fitted in the same room as the stove as
this can cause the stove to emit fumes into the room.
• If this appliance is installed into an existing chimney, the chimney must first be swept
and examined for soundness and suitability before the appliance is installed (see also
section headed “Chimney”).
Page view 63
1 2 ... 59 60 61 62 63 64 65 66 67 68 69 ... 217 218

Comments to this Manuals

No comments